- +687 76.12.16
- monday to friday 7h30 – 12h / 13h – 17h
Scaffolding
With lead engineers and certified technicians, the group supports its major clients in the access engineering professions, through:
• management and planning of major shutdowns
• maintenance interventions
• the design, calculation and feasibility study of scaffolding structures at height.
Building - Urban Area
- 6 Tons of material
- Calculation of supports and buckling, list of materials
 
													 
													 
													Residential building
- 4 Tons of material
- Calculation of supports and load absorption - no support on the facade
- List of materials
 
													 
													industry
- 8.5 Tons of matériel
- Load recovery in 50 ton vertical prop
- Caledonian wind calculation conditions (Robot simulation)
 
													 
													Swimming pool renovation
- 30 Tons of material
- Confined Renovation of swimming pool
- Material list
spherical tank
- 7 Tons of material
- Gas storage tank renovation
- Wind calculation based on Caledonian conditions
- Material count
Plane
- 3 Tons of Plettac scaffolding
- Coating renovation with confinement
- Material list
